MINUTES OF THE BETHANY INLAND WETLANDS COMMISSION REGULAR MEETING OF MONDAY, DECEMBER 16, 2013                                            Page 1 of 4

The regular meeting of the Inland Wetlands Commission was called to order at 7:31 p.m. in the Commission Meeting Room of the Bethany Town Hall, 40 Peck Road, Bethany, Connecticut.

 

The following members of the Commission were present:

         Alexandra Breslin, Chair

         Kristine Sullivan, Vice-Chair

         Lisa Gaw, Member

         Brian Smith, Member

 

The following members of the Commission were absent or excused:

         Roger Hathaway, Member

         Mig Halpine, Alternate Member

 

Also present was:

            Isabel Kearns, Inland Wetlands Enforcement Officer

 

It was moved by Sullivan and seconded by Smith to receive and add Application #1212 submitted by Alan Towbin for an Inland Wetlands Permit to locate a 8-foot by 8-foot shed located at 77 Oak Ridge Road to the agenda but not to act on or discuss.

Vote 4 to 0.

Voting were:  Breslin, Sullivan, Gaw, Smith.

Unanimous approval.

 

 

NEW BUSINESS

 

1.      755 Amity Road, Application #1211 submitted by Stephen Whitaker for an Inland Wetlands Permit for a new community center located at 755 Amity Road

 

The Commission formally received the application.  Present to speak on behalf of this application was Stephen Whitaker, Ames & Whitaker Architects in Southington, CT.

 

In discussion, Commission members noted:

  • There are no wetlands anywhere near the facility.
  • No new onsite drainage work proposed.
  • The consensus of the Commission was that there is no IW action necessary.

 

It was moved by Sullivan and seconded by Smith that the Inland Wetlands Commission finds that there is no Inland Wetlands Commission action necessary because the activity is not within the 150 foot regulated area of the Commission’s review.

Vote 4 to 0.

Voting were:  Breslin, Sullivan, Gaw, Smith.

Unanimous approval.

 

OLD BUSINESS

 

1.      234 Amity Road (Surreybrook School), Application #1210 submitted by Kathleen Consoli for a Site Plan Approval to construct a barn 20 feet by 30 feet

 

No one was present to speak on behalf of this application.

 

The Commission conducted a site visit on December 8, 2013. 

 

In discussion, Commission members noted:

  • Barn will be located in existing flat lawn area.
  • Applicant downsizing barn.

 

It was moved by Sullivan and seconded by Smith to approve Application #1210 submitted by Kathleen Consoli (Surreybrook School) for a Site Plan Approval to construct a barn not to exceed 20-feet by 30-feet located at 234 Amity Road, as presented in the application, testimony and in accordance with the submitted plan, untitled, with hand-drawn markings prepared by the applicant and dated November 19, 2013, and this approval is subject to the standard conditions found on the Land Records Volume 93, Page 802 and 803.  If the applicant decides to do more excavation for the foundation, they will need to contact the Inland Wetlands Enforcement Officer.  Based on our observations at the site inspection, there should be no adverse impact to the onsite wetlands from the proposed project.

Vote 4 to 0.

Voting were:  Breslin, Sullivan, Gaw, Smith.

Unanimous approval.

 

 

2.      4 and 21 Meyers Road, Application #1209 submitted by Green Haven, Inc. for an

      Inland Wetlands Permit for Site Plan and a Stormwater Management Plan Review

 

The public hearing is scheduled for January 27, 2014.  Tabled.

 

3.  Discussion regarding Bethany West clearing.  (Letter from Roman

Mrozinski/Southwest Conservation District)

 

Member Breslin and Sullivan will be attending the Conservation Commission meeting in January, 2014.  Tabled.

 

4.  Discussion with David Puzone, regarding 33 Deerfield Lane, development of

     property  Tabled.

 

5.  185 Beacon Road, Discussion with Daniel Cusano regarding non-permitted barn

     Tabled. 

 

 

6.  Continuation of Show Cause Hearing regarding Town of Bethany drainage repairs

     conducted in a regulated area without an Inland Wetlands PermitTabled.

 

7.  Update on appeal submitted by James Woodward for 46 Mesa DriveTabled.

 

8.  Discussion in regard to amendments to the Inland Wetlands Regulations per State

     of CT  Tabled.

 

 

APPROVAL OF MINUTES

 

1. It was moved by Smith and seconded by Gaw, to approve as amended, the minutes of

     the November 25, 2013, Regular Meeting.

     Voting were:  Sullivan, Gaw, Smith.

     Breslin abstained.

     Approved.

 

2.  It was moved by Sullivan and seconded by Smith to approve, as submitted, the minutes of

     the December 8, 2013, Special Meeting/Site Visit.

     Voting were:  Sullivan and Smith.

     Breslin abstained.

     Approved.

 

 

GENERAL CORRESPONDENCE

 

1.      Letter from Nancy McCarthy, Town Clerk, dated November 20, 2013, Re:  Request for regular meeting schedule for 2014 with attached draft of 2014 Regular Meeting Schedule prepared by clerk.

It was moved by Sullivan and seconded by Gaw to accept and approve the proposed schedule

of regular meetings prepared by the Clerk from January 2014 to January 2015 with the one

change in the December 2014 meeting date.

Vote 4 to 0.

Voting were:  Breslin, Sullivan, Gaw, Smith.

Unanimous approval.

 

 

ENFORCEMENT OFFICER REPORTS –

 

Isabel Kearns, IWEO, reported on the Gaetano’s at 187 Beacon Road.  Ms. Kearns stated she spoke with Beth Gaetano and she stated that they never introduced anything to the site and that the erosion  was created by Mr. Cusano’s filling of his property at 185 Beacon Road.  Member Sullivan stated there was also filling along the slope near the house.  Tabled.

 

 

 

SCHEDULE SITE VISITS – None

 

 

ADJOURNMENT

 

There being no further business to come before the Commission, it was moved by Smith .

 and seconded by Sullivan to adjourn the regular meeting at 7:55 p.m.  Unanimous approval.

 

Respectfully submitted,

 

 

 

Antonia R. Marek, Clerk

for the Inland Wetlands Commission